June 22

The mast is up, the guys are fabricated, and it is time to take down the Force 12 GT5 Sigma and move it to a lower mounting place.

It was a long day – lots of errors but the first level guys (10 ft level) are up and tensioned.

Tomorrow is finish installing the guys and get the rotator installed. Hopefully Wednesday the XYL will be able to help me get the antenna on top of the mast. It will be interesting!

Comments are closed.